100ton per day Gas field water associated resource recovery of lithium and other metal by-products


Project Type: Comprehensive Utilization and Standardized Treatment of Associated Resources from Gas Field Water
Equipment Names: Pretreatment System, Continuous Lithium Extraction System, MVR Evaporation and Crystallization System, Boron Removal and Bromine Extraction Units, etc.
Project Location: Sichuan, China
Processing Capacity: 100 m³/d Gas Field Water Feed
Designed Output: Lithium Carbonate (18 tons/year), Potassium Chloride (120 tons/year), Industrial Salt/Sodium Chloride (1800 tons/year), Sodium Bromide (6 tons/year)
Project Operation Date: October 2024



















